摘要
某发电厂沉渣池由于设计时没有考虑抗浮措施,施工完成后,池体在地下水浮力的作用下上浮倾斜,严重影响池的正常使用。本文通过分析,并采取纠偏及加固措施,使沉渣池恢复正常的使用。
Because of no measures to resist floating in design,a power plant ash pond floated and inclined with the groundwater flotage after construction,which have influenced the normal use of the ash pond.In this article,the author analyze reasons and take some rectify and strengthening measures to resume the normal use of the ash pond.
出处
《施工技术》
CAS
北大核心
2005年第S1期343-344,共2页
Construction Technology
关键词
沉渣池
上浮
纠偏
加固
施工
ash pond
floating
rectify
strengthen
construction