摘要
结合大型油罐地基的工程特性 ,在分析以往地基处理方法的基础上 ,提出了刚性桩复合地基基础 ,并阐述了其工作机理、设计计算方法、载荷试验要求及应用效果。
Through analysis of geotechnical properties of big oil-tank ground and existing ground treatment methods, a new method-rigid pile composite foundation used for big oil-tank is presented, and its mechanism, design and calculation method, requirement for load test, and results of application are also introduced in this paper.
出处
《矿产勘查》
2000年第10期26-28,共3页
Mineral Exploration
关键词
大型油罐
地基处理
刚性桩复合地基基础
Big oil-tank Ground treatment Rigid pile composite foundation