内昆铁路邓家湾1~#车站隧道3线大跨施工技术

CONSTRUCTION TECHNOLOGY FOR THREE-LINE LONG-SPAN TUNNEL IN DENNGJIAWAN STATION NO.1 ON NEIKUN RAILWAY
下载PDF
导出
摘要 邓家湾 1 #隧道为车站 3线大跨隧道 ,跨度大 ,结构扁平 ,地质复杂 ,施工难度大。在该隧道施工中 ,通过变更施工方法 ,以小导坑贯通揭示地质 ,及对监测资料的分析 ,确定了大跨段采用台阶法通过的施工方案 。 Dengjiawan tunel No.1 is three-line long-span tunnel in station.It is of long span,flat structure,and complex geological conditions.And thus it is difficult to be constructed.During the construction of this tunnel,through a ltering construction method,revealing geological situations by the penetration of base tunnel,and analyzing the data from monitoring,We determined the data from monitoring,We determined the construction scheme of using bench method to pass through long-span section,which laid the foundation of safe and smooth construction of this tunnel.the successful completion of this tunnel offersuseful reference and guidance for the design and construction of later similar project.
作者 陈建
出处 《矿产勘查》 2000年第9期32-34,共3页 Mineral Exploration
关键词 3线大跨隧道 施工技术 three-line long-span tunnel,construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部