摘要
结合青山隧道实际情况介绍了所运用的多种施工机械配套模式。
As the railway tunnel construction technology develops in China,tunnel construction equipment set forming technology has also improved very much, thus many types of construction equipment set models have come into being for single-track and double-track railway tunnels. The superiority and inferiority of the equipment set models are always in probe and discussion. Combining the actual conditions of Qingshan tunnel, the author describes several construction equipment set models in the paper, which have some reference significance for the other tunnels.
出处
《矿产勘查》
2000年第5期34-37,共4页
Mineral Exploration
关键词
隧道
施工
机械配套
tunnel, construction,equipment set forming