摘要
通过对“8 .1”工程滑坡进行原因分析 ,提出处理措施 ,现已逾二年 ,再未活动 。
After the reasons of '8.1' engineering landslide is analyzed.The measure treated of engineering landslide is put forword.The landslide has been not occurred for two years.The project achieves the desired results.
出处
《矿产勘查》
2000年第3期30-34,37,共6页
Mineral Exploration
关键词
滑坡
分析
整治
landslide,analysis,measure