摘要
The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem.
The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation,:parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit-and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem.
出处
《中国有色金属学会会刊:英文版》
CSCD
2000年第1期119-122,共4页
Transactions of Nonferrous Metals Society of China