Some Opinions on Type Selection of 600 MW Turbo-generator
-
1Gu Junyang,Shi Wenbao,Ye Qing(Translated).Type Selection for Present Nuclear Power Development in China[J].Electricity,2006,17(1):15-20.
-
2Li Weidong,Zhou Hongguang,Zhang Jingwu,Xu Chuankai.Type Selection of Burning Equipment for Slagging-Coal Boilers[J].Electricity,2012,23(1):32-35.
-
3Ding Huijuan Academia sinica,ChinaSheng Changda China Electricity Council.First 50 MVA turbo-type synchronous condenser with evaporative cooling of stator commissioned[J].Electricity,1992(3):9-9.
-
4Li Weidong 1 , Zhang Yun 2 , Xu Chuankai 3 , Zhang Jingwu 4 1. Huaneng Power International Inc. 2. Huaneng Yingkou Cogeneration Power Plant 3. Xi’an Thermal Power Research Institute Co., Ltd. 4. Northeast Electric Power Research Institute Co., Ltd. Zhu Xianran.Type Selection of Burning Equipment for Lignite Boilers[J].Electricity,2011,22(5):27-30.
-
5Yuan Jixiu North China Electric Power Design InstituteLi Wenyi Electric Power Department of Ministry of Energy.Investigation and recommendation on allowable operating duration of large-sized turbine-generator unit under abnormal frequency[J].Electricity,1992(3):23-28.
-
6Huanling Feng.Risk Assessment of Tropical Cyclones to Wind Farm Operation in Northern Costal Areas of Jiangsu Province[J].Meteorological and Environmental Research,2013,4(8):17-20.