The first 1000 MW class thermal power plant emerged in Jiangxi Province
-
1Automation of Thermal Power Plant[J].Electricity,1999(3):51-51.
-
2Improvement in Mechanical Design of Chinese Thermal Power Plant[J].Electricity,1999(1):18-21.
-
3Development of Design for Circulating Water Intake Structure in Thermal Power Plant[J].Electricity,1997(4):44-46.
-
4Su Guoquan,Zhao Yangdng ,Fan Qinnan,Pu Weixing,Zhu Chuanqiang (Nanjing Automation Research Institute).Distributed Control System Retrofit for 200 MW Units of Thermal Power Plant[J].Electricity,1998(4):34-37.
-
5500 MW Unit Simulator for Panshan Thermal Power Plant Passed Acceptance[J].Electricity,1996(4):36-36.
-
6The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation[J].Electricity,2000(3):45-45.
-
7CONSTRUCTION OF GUIZHOU PANXINA THERMAL POWER PLANT PHASE Ⅱ SPEED UP TO PROMOTE THE COURSE "SENDING POWER FROM WEST TO EAST[J].Electricity,2000(3):49-49.
-
8Pengze Nuclear Power Project in steady progress[J].Electricity,2010,21(4):13-13.
-
9A 300 MW Thermal Unit Start Successfully on First Trial[J].Electricity,1996(4):19-19.
-
10Bing-Xian PENG,Lan LI,Dai-She WU.Distribution of bromine and iodine in thermal power plant[J].Journal of Coal Science & Engineering(China),2013,19(3):387-391. 被引量:2