摘要
介绍了该装置的试车及运行,对设备、工艺中存在的问题加以分析说明,结论证明Ⅲ期工程的总体设计是合理的,与Ⅰ期、Ⅱ期相比较具有很大的优越性,但在一些细节方面仍存在问题。
The trail run and the operation of the title facility are introduced. Some problems of the equipment and process are analyzed. The overall design of the third-stage project has proved itself to be rational with many advantages over those of the first-and second-stage project. However,there are still some problems in point of details.
出处
《氯碱工业》
CAS
1999年第3期15-17,共3页
Chlor-Alkali Industry
关键词
离子膜
制碱
运行
ion-exchange membrane,caustic soda manufacture,operation