期刊文献+

乌审旗水土保持工程规划目标及实施对策

Planning Objects and Practising Measures on Soil and Water Conservational Project in Wushen County
下载PDF
导出
摘要 无定河流域乌审旗段的水土流失治理工程于1982年立项实施,第一期(1983~1992年)和二期第一阶段(1993~1997年)15年时间,先后完成了17条小流域综合治理,共计治理水土流失面积988.26km2,使治理区综合治理程度达81.7%,并取得了巨大的社会、生态、经济效益,对乌审旗农村、牧区经济发展起到了巨大的推动作用。 The harnessive project on soil and water conservation of Wuding river watershed in Wushen county was put into practice from 1982. The first and second phase projects have been practised about 15 years, 17 small watersheds have been comprehensively harnessed. The harnessed area has been reach to 988.26 km 2 and comprehensive harnessing extent reached about 81.7 %. Therefore, social, ecological and economic benefits have been obtained obviously, the harnessive result would play an important role to develop economy in rural and pastoral areas.
出处 《水土保持研究》 CSCD 1999年第S1期63-66,共4页 Research of Soil and Water Conservation
关键词 水土保持 规划 实施对策 soil and water conservation planning practising measrures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部