摘要 交岔点是指巷道相交或分岔的地点。龙首矿现有的平巷交岔点都是根据《采矿设计手册》中的交岔点设计计算及作图方法设计而成。这种设计的交岔点工程量大,交岔点处巷道断面大,受力状态不好,且有部分空间在实际应用中并无多大用处。本文根据实际设计及施工中存在的问题,以金川公司龙首矿1280中段41#交岔点为例,对交岔点的设计修改进行了分析和计算。 Intersection means the place where drifts intersect at or branch off.All the existing drift intersections in Dragon Head Mine were designed in the light of the calculation and drafting methods for intersection design in Mining Design Manual.The intersections of this design were more amount of work,larger section of drift at intersection place,not so good in loading state and partial space of them was less use in actual application.This paper,in the light of the problems existing in practical design and construction,conducted analysis and calulation to the modification of intersection design with No.41 intersection on 1280 level of Dragon Head Mine as an example.
作者 王振华
出处 《矿业研究与开发》 CAS 1999年第S4期26-29,共4页 Mining Research and Development
关键词 平巷交岔点 设计方法 可行性 Drift intersection,Design method,Feasibility
  • 相关文献

同被引文献7

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部