会东铅锌矿露天地下联合开采方案的探讨 被引量:1

An Approach to the Scheme of Surface and Underground Combined Mining in Huidong Lead Zinc Mine
下载PDF
导出
摘要 会东铅锌矿初步设计的露天地下联合开采方案,确定地下采矿从露天坑底1980m 水平开始,用下向分层进路胶结充填法采矿,并逐步形成厚36m 的隔离柱,但该方案已不适应该矿的实际情况。本文讨论了5种调整方案,并认为地下首采区选择在露天坑底水平以外,能扩大露天采矿范围,减少隔离柱构筑费用,且露天开采和地下开采互不制约。 In the Surface and underground combined mining scheme of the primarg design in Huidong Lead Zinc Mine,it was decided to start underground mining at 1980m tevel under the open pit bottom by downward slice and drift mining with cemented filling and gradually form a 36m thick separation pillar,howerer this scheme was not suited to the actual situation of the mine already.This paper discussed five modified schemes and considered that the initial underground mining area selected outside the open pit bottom was able to expand open pit mining range,reduce the construction cost of separation pillar and eliminate interfernce between open mining and underground mining.
出处 《矿业研究与开发》 CAS 1999年第S2期24-27,共4页 Mining Research and Development
关键词 露天地下联合开采 方案 平整过渡 隔离柱 Surface and underground combined mining, Sckeme, Smooth transition, Separation pillar
  • 相关文献

同被引文献13

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部