摘要
铜绿山矿掘进的碴石由新副井提升至地表。新副井的提升能力大。
The development waste is hoisted to the surface by new auxiliary shaft. The lifting capacity of new auxiliary shaft is high. Therefore, selection of a good form of advancement construction organization and application of mechanized development operating line are able to exploit the shafts potential hoisting capacity.
出处
《矿业研究与开发》
CAS
1999年第S1期37-38,共2页
Mining Research and Development
关键词
掘进
提升能力
施工组织
机械化作业线
Drifting, Hoisting capacity, Construction organization, Mechanized operating line