摘要
本文简要论述了引黄水入汾河水库后,如何根据汾河水库枢纽工程布置情况及地形地质条件,选择合理的取水口位置,以保质保量地把引黄水送到太原市呼延水厂。
As the water diverted from the Yellow River is to be sent to,to be regulated by and to be discharged thereafetr from the Fenhe Reservoir,to select rationally the intake location has come to be a very important problem for supplying water to Taiyuan with quality and quantity guaranteed.In this paper,two intake location schemes are compared from the view of water quality,topographic,geologic and construction conditions,project layout and project investment.The conclusion is that the intake on the right bank is better than that on the left bank.
出处
《山西水利科技》
1999年第S1期5-6,共2页
Shanxi Hydrotechnics
关键词
引黄工程
联接段
汾河水库
方案研究
Yellow River Diversion Project(YRDP)Connection Works Fenhe Reservoir Water Intake Scheme