泵船综合措施取水在尊村引黄灌区补充水源工程上的应用

Application of the Comprehensive Measure of Pump-ship In Zuncun Supplementary Water Project
下载PDF
导出
摘要 尊村补充水源工程是为解决尊村泵站长期脱流问题提出的。根据河道变化的特点,尊村补充水源采取“提、引、挖、堵”综合措施来实现。其组成部分主要有:泵船、船池、输水管道、输水渠、输电线路、挖泥机械等。 Zuncun supplementary water project is proposed to solve the long-term problem of that the flow of the Yellow River separates from the intake of Zuncun pumping station.According to the characteristics of change of local river course,the comprehensive measures of “lifting water by pump-ship,diverting water by canal and natural branch river course,digging the diverting or conveyance canal when necessay by excavator,and blocking the branch river course downstream”is taken.The system consists of pump,ship,ship pool,water-conveyance pipeline,canal,power transmission line,dredging equipment and so on.
作者 刘刊
出处 《山西水利科技》 1999年第S1期71-72,共2页 Shanxi Hydrotechnics
关键词 泵船 黄河小北干流 尊村泵站 渠道 Pump and Ship Canal Pumping Station Yellow River
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部