CPECC Rapid Growth in Contracting Overseas Projects
CPECC Rapid Growth in Contracting Overseas Projects
-
1Xinhua.China's chemical industrial output up 2.4%, contracting trend eased[J].China's Foreign Trade,2009(8):14-14.
-
2CPECC[J].China Oil & Gas,1999,6(2):134-134.
-
3Xang Xingwu,Jin Mingsan,Xu Enxin,Chen Xiulian.Developing Course and New Strategy of ZPEB’s Overseas Projects[J].China Oil & Gas,2008,15(3):51-55.
-
4李嘉陵.浅议国际型工程公司项目管理组织形式[J].施工企业管理,2003(9):45-47.
-
5Zhou Rui.Losses Reported in Overseas Projects of Chinese Oil Majors[J].China Oil & Gas,2011,18(3):16-18.
-
6Sudan Pipeline Project Contracting[J].China Oil & Gas,1998,5(4):246-246.
-
7中国石油加拿大麦肯河一期项目投产[J].国企管理,2017(1):23-23.
-
8姚晓芳.集中报销在CPECC的应用[J].现代商业,2014(18):257-258. 被引量:1
-
9Shanghai GM maintains a momentum of rapid growth[J].中国汽车(英文版),2004(1):7-8.
-
10Edward Minchin,Ralph D. Ellis,Jae-Ho Pyeon,Jichao Zhan.Use of Innovative Contracting Methods by Dots - Project Managers Speak[J].Journal of Civil Engineering and Architecture,2010,4(8):14-26.