摘要
对200 MW 单元机组热控系统现场信号的采集及存在的问题进行分析。
Analyzes the acquisition of field signal from the thermal control system of 200 MW generating unit and existing problems, and presents the application of isolating converter to the acquisition of sample switching variables and partial analog variables and precautions to be taken.
出处
《黑龙江电力》
CAS
1999年第4期54-55,共2页
Heilongjiang Electric Power
关键词
单元机组
隔离转换器
技术改造
generating unit, isolating converter, technique reform