摘要
“96·7”洪水造成猫跳河窄巷口水电站进水口拦污垮塌、立柱折断事故,并发现水库右岸进水口下游侧护坡脚有漏水洞。经放空水库进行溶洞处理及进水口改造,电站停机200余天后恢复正常发电。
The rack collapsing and a vertical column breaking of the intake in Zhaixiangkou Hydropower Station resulted from the flood of July 1997, then a leakage cave was founded in the revet foot downstream from the intake on the right bank. After emptied the reservoir, intake was transformed and the karst cave was blocked, the station renweed normal electricity generation 200 days later on.
出处
《贵州水力发电》
1998年第2期28-30,共3页
Guizhou Water Power
关键词
窄巷口水电站
溶洞封堵
进水口改造
Zhaixiangkou Hydropower Station, intake transformation, karst cave blocking