摘要
太原第二热电厂四期扩建工程是经国家计委批准的省级重点工程,向阳供水工程是该工程的重要组成部分。该供水工程由6眼深井和供水厂组成,工程设计了4个可行的群井供电方案,应用决策矩阵法进行技术经济分析评价。经决策,选出高低压混合供电方案为最优方案。
The fourth extention project approved by the state planning commission of the Taiyuan second thermol power plant is the key project of Shanxi province. The water supply engmerrmg is the important part of the project. The water supply system consists of six wells and a water supply plant. The optimum design plan is the power supply with high and low voltage by decision matrix method and economic analysis from four kinds of possible power supply plans.
出处
《科技创新与生产力》
1997年第3期14-15,共2页
Sci-tech Innovation and Productivity
关键词
井泵
电力供水
供电系统
最优设计
well pump, water supply by electric power, power system, optimum design system, opti- mum design