摘要
According to the demand of modern surface mine production, production, a multi-objective optimum dispatchingmodel is set up in this paper, it includes overall comprehensive optimal model, the goal programming model to optimize truck fleet in mine haulage system, and the selection of real time dispatching criteria. A surface coal mineis studied as a case in a built system simulation mantel, and the simulation result shows that the model is correct.
According to the demand of modern surface mine production, production, a multi-objective optimum dispatchingmodel is set up in this paper, it includes overall comprehensive optimal model, the goal programming model to optimize truck fleet in mine haulage system, and the selection of real time dispatching criteria. A surface coal mineis studied as a case in a built system simulation mantel, and the simulation result shows that the model is correct.