期刊文献+

深孔崩矿阶段充填法在铜绿山矿的应用 被引量:1

AN APPLICATION OF LONGHOLE CAVING AND LEVEL FILLING METHOD IN TONGLUSHAN MINE
下载PDF
导出
摘要 铜绿山矿原设计采用点条柱上向水平分层水砂充填法开采,经多年实践表明,该法问题多而不适应矿山生产要求,为解决问题,改用深孔崩矿阶段充填法.本文总结了该法的试验研究成果,推出品字形采场结构、球状和柱状药包在深孔爆破中应用的新材料与新工艺、三合一胶结充填方法和高水固化材料充填接顶工艺等内容.试验研究取得了显著的技术经济效益. The origninal mining design in Tonglushan mine was upward cut-and-fill mining with point and strip pillars and hydraulic stowage. The many-years practice showed that this mining method was not suitable for the requirements of mining produc-tion due to many problems. In order to solve these problems, the longhole caving and level filling method instead of original mining method was used. The author sums up the achievements in the experimental study on the experiment method, and makes an introduc-tion to '品'-shape stope structure, new material and technology of both spherical and col-umn charges used in the longhole blasting, the three-in-one cemented filling method, and roof-contact filling with high-water consolidating materials etc, including the remarked technical and economic results produced from this mining method.
作者 周圣元
机构地区 长沙矿山研究院
出处 《矿业研究与开发》 CAS 北大核心 1996年第S1期62-67,共6页 Mining Research and Development
关键词 深孔崩矿 球状和柱状药包爆破 胶结充填 高水固化材料 充填接顶 Longhole caving, Spherical column charge blasting, Cemented filling, High-water consolidating material, Roof-contact filling
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部