摘要
本文分析了南京地区铁路的需求,现状和规划之间的关系;提出了拟建的京沪高速铁路在南京越江的新构想,探讨分析了由此可能产生的各种问题和解决办法,最后对几种通道方式做了比选。
The railway requirements in the Nanjing District,the present statu and its relationwith the railway program are analyzed in this paper.A new scheme of building Jing-Hu high-speed railway crossing over Yangtze River at Nanjing is proposed.Various problems which maybe occurred under this scheme and the measures for solving these problems are analyzed and dis-cussed. Finally,several forms of crossing over the Yangtze River are contrasted and selected.
出处
《铁道工程学报》
EI
1995年第4期25-28,共4页
Journal of Railway Engineering Society
关键词
南京地区
铁路
越江方案
Nanjing District
railway
scheme of crossing over the Yangtze River