矿井最大涌水量计算和参数确定──试论南方岩溶矿井的水均衡预测方法 被引量:6

CALCULATION OF MAXIMUM GUSHING WATER IN MINES AND ITS PARAMETER DETERMINATION ON PREDICTION OFGROUNDWATER BALANCE OF KARST MINES IN CHINA
下载PDF
导出
摘要 我国南方岩溶管道流矿井涌水量计算问题较复杂。本文通过地下水动态过程曲线的均衡分析,以暗河排泄流量反求补给水量,并借河渠洪流估算理论预计矿井最大涌水量。由于对确定的数学模型,采用了集中参数系统和宏观求取参数的方法,使计算简便新颖。文中附有计算涌水量实例和矿井涌水量预测验证资料,表明方法的可靠性。 Calculation of gushing water in mines in karst region in south China has been complicated. On the basis of groundwater balance cure, this paper calculates groundwater recharge rate from underground river discharge and estimates maximum gushing water in mines from stream flood routing. Thanks to the given mathematic model and maeroscopic estimating of the parameters, the calculation becomes simple. Examples of calculation of maximum gushing water in mines and testing and verifying data on the prediction of maximum gushing water in mines are enumerated.
作者 董兴文
出处 《四川地质学报》 1995年第1期75-80,共6页 Acta Geologica Sichuan
关键词 动态过程曲线 均衡期 最大流量 渗入系数 水位重合 groundwater regime curve, balance stage, maximum discharge, seepage coefficient, water-level coincide
  • 相关文献

参考文献4

二级参考文献3

  • 1姜本.下渗补给量和入渗补给系数的一种简便计算方法[J]煤田地质与勘探,1986(04).
  • 2何宇彬.喀斯特水文学[M]地质出版社,1982.
  • 3地质部水文地质工程地质研究所选.地下水资源评价理论与方法的研究[M]地质出版社,1982.

共引文献2

同被引文献40

引证文献6

二级引证文献146

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部