期刊文献+

连云港近岸海域物理自净能力研究及水质预测——Ⅰ.西大堤工程对潮流场的影响 被引量:3

THE STUDY OF PHYSICAL SELF-PURIFICATION CAPABILITY AND THE PREDICTION OF WATER QUALITY IN THE OFFSHORE AREAOF LIANYUNGANG——I . THE INFLUENCE OF XTDABA DAM PROJECT OF LIANYUNGANG ON TIDAL CURRENT FIELD
下载PDF
导出
摘要 采用有限差分解法,建立了连云港近岸海域二维固定边界和变边界潮流数值模型。分别对现状流场和西大堤建成后的流场进行计算和预测。得出了潮波图,潮流椭圆图,最大流速分布和不同时刻的流场图,计算结果与实测值吻合良好。 A finite difference technique is used to construct two-dimensional fixed boundary and varied boundary tidal current numerical models, to culculate the present current field and to predict the current field when the construction of the Xidaba Dam is completed. The fugures of tidal wave, tidal current ellipses, the distribution of maximum current speed, and the current fields at different times are obtained. The tally of computation and observation is good.
出处 《中国海洋大学学报(自然科学版)》 CAS CSCD 1994年第S1期161-167,共7页 Periodical of Ocean University of China
关键词 连云港 近岸海域 潮流 数值计算 物理自净能力 Lianyungang physical self- purification capability coastal water area tidal current numerical computation
  • 相关文献

参考文献3

共引文献25

同被引文献30

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部