期刊文献+

FORMULAE OF OPTIMUM TIME-INTERVAL OF STREAMLINED PRODUCTION NETWORK

FORMULAE OF OPTIMUM TIME-INTERVAL OF STREAMLINED PRODUCTION NETWORK
下载PDF
导出
摘要 In this paper the calculation formulae of optimum beginning time-inter-val and optimum finishing time-interval between every two adjacent operations forthe most general current production network are derived.Two examples show thatthese formulae are very convenient for calculation. In this paper the calculation formulae of optimum beginning time-inter- val and optimum finishing time-interval between every two adjacent operations for the most general current production network are derived.Two examples show that these formulae are very convenient for calculation.
出处 《Journal of Southeast University(English Edition)》 EI CAS 1993年第1期70-75,共6页 东南大学学报(英文版)
关键词 MATHEMATICAL PROGRAMMING network analysis management PLANNING mathematical programming network analysis management planning
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部