摘要
In this paper the calculation formulae of optimum beginning time-inter-val and optimum finishing time-interval between every two adjacent operations forthe most general current production network are derived.Two examples show thatthese formulae are very convenient for calculation.
In this paper the calculation formulae of optimum beginning time-inter- val and optimum finishing time-interval between every two adjacent operations for the most general current production network are derived.Two examples show that these formulae are very convenient for calculation.