摘要
本文提出了用随机生产模拟的近似修改负荷曲线法来改进电源优化程序包WASP—Ⅲ的方法,使改进后的 WASP—Ⅲ的计算速度大大提高,可用于电源优化过程中初选方案的优化,从而可节省大量机时,为其在实际电力系统电源优化中的进一步应用提供了更大的可能与方便。
This paper presents a new approach for improving the power resource module WASP-Ⅲ by means of approximately modifying the load-curves according to that from a probabilistic production simulation.It is shown that the improved module WASP-Ⅲ has a much higher speed of computation, and hence it can be time-savingly used for searching the optimum design in the process of power re- source optimization,That enlarges posibility and convenience of further applications.
出处
《现代电力》
1993年第2期7-14,共8页
Modern Electric Power
关键词
随机生产模拟
电源优化
修改负荷曲线法
电力系统规划
probabilistic production simulation
method of modifying load curves
power system planning
power resource optimization