减沉路堤桩在辰山植物园高填土工程中的应用研究 被引量:5

APPLICATION AND INVESTIGATION OF THE EMBANKMENT PILES IN TALL FILL PROJECT OF SHANGHAI CHENSHAN BOTANICAL GARDEN
原文传递
导出
摘要 为减少高填土对邻近主体建筑的不利影响,减沉路堤桩在辰山植物园工程中得到了广泛应用并在高填土与建筑挡墙之间发挥了隔离缓冲的重要过渡功能。结合现场复合桩基竖向极限抗压承载力静载试验、桩顶反力和土压力分布测试及沉降影响计算分析等要素,阐明该工程减沉路堤桩的设计方法及特点。通过系统研究路堤桩数值计算中结构参数的取值,分析相应的水平位移及桩身弯矩容许值,提出合理的填土和桩基施工工序。 In order to reduce the the adverse impacts of the tall fill on the nearby buildings,the embankment piles were widely used in Shanghai Chenshan Botanical Garden and played a significant role between major structures retaining wall and the tall fill.This paper introduced special design technology measures of the test piles and discussed engineering features of the experiment of composite piled foundation,pile-soil ratio testing and settlement analysis.The design parameters were studied carefully so that the precise possible displacement and bending moment of the single pile could be obtained.Based on the accurate reaction of the pile stress and deformation in various conditions by three-dimensional finite element software,it was proposed reasonable fill and construction sequences of the pile foundation.
作者 贾水钟
出处 《工业建筑》 CSCD 北大核心 2011年第11期25-29,共5页 Industrial Construction
关键词 高填土 减沉路堤桩 复合桩基试验 桩顶反力及土压力测试 桩土工作数值分析 单桩容许水平位移 tall fill embankment piles test of composite pile foundation pile-soil ratio test numerical analysis of the pile-soil work allowable bearing capacity of the single pile
  • 相关文献

参考文献16

二级参考文献62

共引文献1029

同被引文献22

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部