摘要 随着风电并网容量的增加,调峰和电网输送能力已成为电力系统消纳风电的瓶颈。为直观表达省级系统消纳风电的能力,指导风电发展规划以及未来调度运行工作,结合中国电力系统运行特性,研究了综合考虑调峰约束和电网输送能力约束的风电电量消纳预测方法,并根据中国北方风电富集省份现有的电网条件、电源结构、实际运行方式等信息,对多种场景下两相邻省份水平年风电电量消纳情况进行了详细预测分析,最后根据电力系统实际运行情况,提出了提高风电消纳能力的措施和建议。 With the increasing of wind power installed capacity,peak load regulation and transmission capacity have become main restrictions for accommodation of wind power.In order to provide an intuitive demonstration on the accommodation of wind power and guidance for the planning and dispatching of wind power,this paper presents a method for predicting the accommodation of wind energy considering peak load and transmission regulation.Based on the present condition of the gird,construction of power source and the actual operational data of the northern provinces of China with rich wind power resource,this paper analyzes and predicts two provinces' available capability of wind energy in the target year under different scenarios.At last,this paper gives advices to improve the capability to connect wind power.
出处 《电力系统自动化》 EI CSCD 北大核心 2011年第22期77-81,共5页 Automation of Electric Power Systems
基金 国家科技支撑计划资助项目(2011BAA07B03) 国家高技术研究发展计划(863计划)资助项目(2011AA05A101) 国家电网公司科技项目(NY71-10-001)~~
关键词 风电消纳能力 风电消纳预测 调峰约束 电网输送约束 风电限电 ability for accommodating wind power wind energy accommodation prediction peak load regulation transmission regulation wind power curtailment
  • 相关文献

参考文献12

  • 1国家电网公司.促进风电发展白皮书[R].北京:国家电网公司2011:3-7.
  • 2雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89. 被引量:457
  • 3王晓波,董存,郭雷,等.吉林省规划网架下松白电网风电接入能力分析[C]//2008年中国电机工程学会年会论文集,.
  • 4韩小琪,孙寿广,戚庆茹.从系统调峰角度评估电网接纳风电能力[J].中国电力,2010,43(6):16-19. 被引量:85
  • 5姚金雄,张世强.基于调峰能力分析的电网风电接纳能力研究[J].电网与清洁能源,2010,26(7):25-28. 被引量:39
  • 6MATEVOSYAN Julija. Wind power integration in power systems with transmission bottlenecks [J]. IEEE Trans on Power Systems, 2007, 17(4) : 1132-1139.
  • 7FINK S, MUDD C, PORTER K, et al. Wind energy curtailment case studies[EB/OL].[2009-10-15], http://www. nrel. gov/docs/fy10osti/46716, pdf.
  • 8ZHA Hao, HUANG Yuehui, LI Peng, et al. Day-ahead powergrid optimal dispatching strategy coordinating wind power[C]// Proceedings of Asia-Pacific Power and Energy Engineering Conference ( APPEEC2011 ), March 25-28, 2011, Wuhan, China : 1-4.
  • 9AKHMATOV V, KNUDSEN H. An aggregate model of a grid-connected, large-scale, offshore wind farm for power stability investigations-importance of windmill mechanical system[J]. Electrical Power and Energy Systems, 2002 (24) : 709-717.
  • 10范高锋,王伟胜,刘纯,戴慧珠.基于人工神经网络的风电功率预测[J].中国电机工程学报,2008,28(34):118-123. 被引量:354

二级参考文献85

共引文献1051

同被引文献1108

引证文献126

二级引证文献1833

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部