摘要
简述了秦皇岛港煤2期改造前的设备现状以及改造的具体方法和措施,效能分析证明此次改造取得了较好的效果。
The paper briefs status of the equipment before improvement,and specific methods and measures for the improvement to Qinhuangdao Port coal phase 2 project,and the performance analysis shows that the improvement has achieved good results.
出处
《起重运输机械》
2011年第11期59-62,共4页
Hoisting and Conveying Machinery
关键词
带式输送机
控制系统
改造
节能
belt conveyor
control system
improvement
energy-saving