摘要 结合工程实际,为实现对新增电厂用户的供气,对LNG气化站供气和现有天然气次高压管网供气的方案进行分析,选取现有天然气次高压管网供气方案。分析比较了增加电厂用户后次高压管网的调度方案,确定采用通过流量遥调系统合理分配门站流量、利用管道储气进行小时调峰的调度方案。 In order to realize gas supply to additional power plant consumer, the schemes of gas supply from LNG vaporizing station and existing natural gas sub-high pressure pipe network are analyzed with the engineering practice. The scheme for gas supply from existing natural gas sub-high pressure pipe network is selected. The dispatching schemes of sub-high pressure pipe network after addition of power plant consumer are analyzed and compared. It is determined that the dispatching schemes of reasonable distribution of gate station flow by remote flow regulating system and hourly peak shaving by pipeline gas storage are used.
作者 黎珍 杨光
出处 《煤气与热力》 2011年第11期1-6,共6页 Gas & Heat
关键词 LNG气化站调峰 次高压管网储气调峰 燃气电厂 调度 流量遥调 peak shaving by LNG vaporizing station peak shaving by gas storage in sub-high pressure pipe network gas-fired power plant dispatching remote flow regulating
  • 相关文献

参考文献2

二级参考文献1

共引文献8

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部