摘要
对AP1000滨海核电常规岛厂房布置方案进行了探讨,提出了局部下沉的方案,在技术相当且满足安全的前提下,投资基本不增加,就能够有效地降低运行费用。
Arrangement plan of CI building of coastal nuclear power plant was discussed and local sinking plan was proposed, which helps to reduce operating cost without increasing investment under equal technique and safety conditions.
出处
《山东电力高等专科学校学报》
2011年第5期34-35,38,共3页
Journal of Shandong Electric Power College