摘要
针对动车组在运行中反复发生应答器丢点现象,结合达成东段提速开通CTCS-2级列控工程,提出对策措施,探讨解决方案并实施取得较好的效果。
To address the phenomenon of balise losing code repeatedly occurring during the operation of EMUs,the countermeasures have been proposed in combination with the speed-up project of the CTCS-2 Level Train Control System in the Eastern section of the Dazhou-Chengdu Railway.The solutions have been discussed and good effects of implementation have been achieved.
出处
《铁道通信信号》
2011年第11期21-22,共2页
Railway Signalling & Communication
关键词
应答器
方案
探讨
Balise
Solution
Discussion