期刊文献+

后搅工艺在100t转炉中的应用 被引量:1

Application of post-stirring process in 100 t converter
原文传递
导出
摘要 介绍了后搅工艺在100 t复吹转炉中的应用,当一次倒炉钢水w(P)<0.040%时,通过单纯后搅或后搅的同时添加少量矿石,后搅时间120~150 s,钢水w(P)能稳定控制在0.020%以下,平均脱碳质量分数为0.01%,LP提高46.8。单纯后搅和后搅同时添加矿石,钢水温降分别为10.2和31.4℃。试验表明,后搅时间达到120 s后,脱磷速度、温降趋于定值,合理的后搅时间是120~150 s。 The present paper introduces the post-stirring process in 100 t converter. Practice shows that when w(P) in the hot metal is less than 0. 040 % in a single tapping the w(P) in the hot metal can be constantly controlled in the limit of less than 0. 020 %, the quality fraction of average decarburization maintains at 0. 01% and Lp improved by 46. 8 by adoption of post-stirring exclusively or post-stirring plus addition of small a- mount of ore for 120 to 150 s. Temperature drop of the hot metal is 10. 2 and 31.4℃ by post-stirring exclusively and post-stirring plus addition of ore. Tests show that the de- phosporization speed and temperature drop tend to maintain at a fixed value as soon as the post-stirring time reaches 120 s and therefore the appropriate post-stirring time shall be 120 to 150 s.
出处 《炼钢》 CAS 北大核心 2011年第6期5-7,共3页 Steelmaking
关键词 转炉 搅拌 脱磷 converter stirring dephosphorization
  • 相关文献

参考文献4

  • 1Kato T. Stirring in the steelmakin4g processes[J]. Trans- actions of ISIJ, 1986,26(10) : 851-854.
  • 2Masahiro Kawakami, Koin Ito. Metallurgical characteristics of combined blowing converter[J ]. Iron and Steel, 1990,76 (11) :1791-1800.
  • 3Higuchi Y, Hanao M. Top and bottom blown converter with wide range gas flow rate for stirring[J]. ISIJ, 2{/07 (7) : 125-127.
  • 4Healy G W. A new look at phosphorus distribution[J]- JI- SI, 1970,208(6) :664-668.

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部