期刊文献+

中转港口集装箱堆场合理布局的模拟研究 被引量:5

下载PDF
导出
摘要 合理的堆场布局可以提高码头机械的操作效率,为减少船舶等待时间,提升码头综合竞争力,通过建立不同箱区长度下的最小化堆场龙门吊数量模型,得出不同箱区长度下的龙门吊数量,并根据龙门吊与桥吊的不同配比关系,使用港口仿真软件Flexsim CT建立8种不同箱区长度下不同装卸机械数量的模拟模型,探讨8种不同的箱区长度对码头装卸效率的影响,得出桥吊最大效率下的箱区长度。
作者 王小变
出处 《水运管理》 2011年第11期23-28,共6页 Shipping Management
基金 上海市教育委员会重点学科建设项目(J50604)
  • 相关文献

参考文献6

  • 1金鑫,丁以中.新工艺下集装箱码头装卸资源分配模拟[J].上海海事大学学报,2010,31(1):28-32. 被引量:5
  • 2MAURIZIO B, BOULMAKOUL A,RIDA M. Objectoriented model for container terminal distributed simulation [J]. European J Operational Research,2006,175 : 1731- 1751.
  • 3PETERING M E H. Effect of block width and storage yard layout on marine container terminal performance [J]. Transportation Research: Part E, 2009( 45 ): 591-610.
  • 4ZHANG Chuqian, LIU Jiyin. Storage space allocation in container terminals [J]. Transporting Research: Part B, 2003 ( 37 ) : 883-903.
  • 5GUO Xi, HUANG Shell Ying, HSUET Wen Jing. Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information [J]. Advanced Engineering Informatics. 2011.25( 3 ), 472-484.
  • 6韩晓龙,丁以中.集装箱港口龙门吊配置优化研究[J].中国航海,2008,31(1):6-8. 被引量:5

二级参考文献15

  • 1吴望名 李念祖.图论及其应用[M].北京:科学出版社,1984..
  • 2CANONACO P, LEGATO P, MAZZA R M, et al. A queuing network model for the management of berth crane operations [ J]. Computers & Operations Res, 2008, 35 (8) : 2432-2446.
  • 3PETERINGA M E H, MURTYB K G. Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal [ J ]. Computers & Operations Res, 2009, 36 (5) : 1711-1725.
  • 4ZENG Qingcheng, YANG Zhongzhen. Integrating simulation and optimization to schedule loading operations in container terminals [ J]. Computers & Operations Res, 2009, 36(6) : 1935-1944.
  • 5LU Chen, NATHALIE B, PIERRE D, et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal [ J ]. Eur J Operational Res, 2007, 118 ( 1 ) : 48-50.
  • 6LEGATO P, GULLI D, TRUNFIO R. Simulation at a maritime container terminal: models and computational frameworks[ C J//Proc 22th Eur conf on Modelling & Simulation ( ECMS 2008). Nicosia, 2008 : 261-269.
  • 7HENRY Y, LAU K,ZHAO Y. Integrated scheduling of handling equipment at automated container terminals [J]. Int J Production Econ, 2008, 112(2) : 665-682.
  • 8孙立启.沿海集装箱中小码头装卸设备配置和工艺研究.中国水运(学术版),2007,:755-756.
  • 9《运筹学》教材编写组.运筹学(第二版)[M].北京:清华大学出版社,1997.271-277.
  • 10Vis I. F. A, Koster R. , Roodbergen K. J. , Peeters L. W.P. Determination of the number of automated guided vehicles required at a semi-automated container terminal [J]. Journal of the operational research society, 2001, (52):409-417.

共引文献8

同被引文献28

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部