期刊文献+

上软下硬地层超深T形地连墙成槽施工难题的处理 被引量:6

Treatment for trench construction puzzle of super-deep T-shape diaphragm wall in two-layered stratum
下载PDF
导出
摘要 埃及塞得东港集装箱码头二期工程的超深T形地下连续墙位于上软下硬且临海水位高的地层中,由于软弱土层深厚且槽孔深度超过60 m,因此成槽技术是施工的关键,需要解决槽壁易坍塌及确保槽孔垂直精度大于1/300这2个重大技术难题。选择液压抓斗成槽机及旋挖钻机组合作为成槽施工的主要设备,施工中通过采取钻设引导孔、槽壁预加固、改善泥浆性能、保持槽内液面等一系列有效的技术措施,解决了成槽施工的重大技术难题。结果证明:超深T形墙的槽孔垂直精度高,没有塌孔现象,成槽时间较短,成本低,能够保证工程质量,取得了良好的社会效益和经济效益。 Super-deep T-shape diaphragm walls of Port Said East Container Terminal-Phase 2 Marine Works in Egypt are embedded in a two-layered stratum with soft upper and hard lower layers with high water head by sea.Because of more than 60 m depth of groove,the technology of trenching was crucial,and groove walls easy to collapse and its verticality insured more than 1/300 were two of momentous technical puzzles to be solved.Central equipments with hydraulic grab buckets and rotary drilling drivers were selected for the trench construction.In the process of trenching,some effective measures were adopted such as guide wall construction,groove walls advance reinforcement,mud of allocated proportion,liquid level controlling,etc.,and momentous technical puzzles of trench construction were solved.Results show that the verticality of super-deep T-shape diaphragm walls is very well without its hole collapse.The trench can be finished with short time,low cost and good quality,and good social and economical benefits are gained.
出处 《水运工程》 北大核心 2011年第11期232-236,共5页 Port & Waterway Engineering
基金 中交四航局2009年科技研发计划(2009-B-01)
关键词 超深T形地下连续墙 槽壁预加固 成槽施工 液压抓斗成槽机 super-deep T-shape diaphragm wall groove wall advance reinforcement trench construction hydraulic grab bucket
  • 相关文献

参考文献3

二级参考文献11

共引文献89

同被引文献29

引证文献6

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部