摘要
文章总结了新建600 MW机组LHB-90A型电解海水制氯装置的调试过程,提出了电解海水制氯系统配套联锁保护和报警功能,并明确了调试相关注意事项,实现了电解海水制氯系统安全稳定、自动高效投运。
The paper summarized the commissioning process of electrolyzed seawater chlorination system in newly built 600 MW unit,it put forward the alarming and interlock protective functions,and made clear to related attention in debugging,after being debugged the system become automatically and efficiently,ensure the safe and stable operation of devices.
出处
《广东化工》
CAS
2011年第11期216-217,共2页
Guangdong Chemical Industry
关键词
电解海水制氯
调试
火电厂
electrolyzed seawater chlorination
commissioning
thermal power plant