区域电网实施辅助服务补偿与并网运行考核机制的关键技术 被引量:3

Key Techniques for Carrying out Ancillary Services Compensation and Grid-Connected Operation Assessment to Regional Power Plants
下载PDF
导出
摘要 介绍了南方区域开展发电厂辅助服务补偿和并网运行考核的情况;阐述了考核技术支持系统的建设模式、考核补偿算法以及考核补偿参数的调整等关键技术及应用;通过对比考核补偿实施前后机组一次调频和自动发电控制(AGC)性能,显示了开展发电厂辅助服务补偿和并网运行考核对于提高电力系统安全稳定水平的重要性。 This article introduces the implementation of auxiliary services compensation and grid-connected operation assessment for power plants in south China region.It focuses on some key technologies and their related application,such as the construction mode of technical support system,assessment and compensation algorithms,the adjustment of assessment and compensation parameters and so on.In addition,by comparing the performances of primary frequency regulation of generator units and the automatic generation control(AGC) before and after implementation of the assessment and compensation,the paper demonstrates the importance of auxiliary services compensation and grid-connected operation assessment for improving the security and stability of power systems.
出处 《能源技术经济》 2011年第8期8-13,共6页 Electric Power Technologic Economics
关键词 电力市场 辅助服务 补偿 考核 power market auxiliary service compensation assessment
  • 相关文献

参考文献26

二级参考文献35

共引文献126

同被引文献16

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部