期刊文献+

下承式单拱斜拉桥吊索张拉施工控制 被引量:2

CONSTRUCTION CONTROL FOR HANGER TENSION OF THROUGH TYPE SINGLE ARCH CABLE-STAYED BRIDGE
下载PDF
导出
摘要 大连市红星大桥主梁为横坡变化的弯梁结构,并且含有纵坡。施工过程中的误差使吊杆的理论锚固点与设计不符,导致结构受力变化。因此需要根据实际情况调整吊杆的索力。该桥为高次超静定、不对称的结构,每根吊杆的张拉都会使结构的整个受力系统发生变化。通过对结构变形观测和斜拉索索力量测,并进行相应计算和调整,最终该桥结构的受力均满足要求。竣工后线型顺畅,受力合理,满足设计要求。 Dalian Hongxing Bridge girder is the curved beam structure with diverse cross-slope and longitudinal. The error produced in construction process makes the anchor points not match with the design and results in the structure force changes. Therefore the cable force must be adjusted according to the actual hanging lever. The bridge is high-statically indeterminate, asymmetrical structure, each boom of the tension will cause the entire force of the structure system change. Through the observation of structural deformation and measurement of cable force of cable-stayed , calculating and adjusting accordingly, finally the force of the bridge is to meet the force requirements. After completion ,the smooth linear and the reasonable force are to meet the design requirements.
作者 林桂枫
出处 《钢结构》 2011年第11期68-71,共4页 Steel Construction
关键词 吊索张拉 数值模拟 索力优化 下承式单拱 hanger tension numerical simulation cable force optimization through type single arch
  • 相关文献

参考文献5

二级参考文献8

  • 1胡广瑞.大型公路钢箱梁整体拼装制造线形和尺寸的控制[J].钢结构,2006,21(5):74-75. 被引量:47
  • 2(美)A.乔伊科奇 D.B.汉森.多目标决策分析及其在工程和经济中的应用[M].,..
  • 3魏权龄 王日爽.数学规划与优化设计[M].国防工业出版社,..
  • 4小缨义隆.钢梁的省力化施工方法和组装的合理化[J].桥梁和基础,1992,(8).
  • 5阿部英彦.工厂制作的机械化和自动化[J].桥梁和基础,1997,(8).
  • 6王禄鹏,成宇海,洪军,等.大跨度钢箱梁板单元构件制造//中国土木工程学会桥梁及结构工程学会第十四届学会论文集.上海:同济大学出版社,2000:130-135
  • 7王辉平,洪军,隋宝善,等.大跨度斜拉桥钢箱梁制造技术//中国土木工程学会桥梁及结构工程学会第十四届会议论文集.上海:同济大学出版社,2000:119-123
  • 8隋允康,钱令希.具有连续梁型式的结构优化设计[J].大连理工大学学报,1991,31(5):521-528. 被引量:2

共引文献45

同被引文献13

引证文献2

相关作者