摘要
介绍了柏叶口水库的地理位置、工程概况,重点说明了施工总体布置和临时设施具体布置方案。
This paper introduces the geographical position and project profile of Baiyekou Reservoir, this paper emphatically describes the overall layout scheme of the construction and concrete layout scheme of temporary facilities.
出处
《科技情报开发与经济》
2011年第31期199-202,共4页
Sci-Tech Information Development & Economy
关键词
施工总体布置方案
临时设施
柏叶口水库
山西省
overall layout scheme of construction
temporary facilities
Baiyekou Reservoir
Shanxi Province