摘要
介绍了中梁水电站建筑安装工程一切险索赔的流程,并以中梁水电站建筑安装工程一切险的索赔实例,详细阐述了该索赔工作的全过程。
This paper introduced a flow of all risks insurance claims of Zhongliang Hydropower Plant construction and installation works and described the whole process of the claims with these works used as the example.