摘要
水电机组开机未并网,若调速器发生故障,重则可能导致机组飞逸事件,严重影响机组安全运行。对隔河岩电厂机组在开机过程中出现过速现象进行了详细分析和探讨。
Failure in governor control system during startup of hydraulic generating unit might result in unit runaway,and impact the safety operation of unit seriously.This paper gives a detailed analysis and discussion regarding the overspeed during the startup of units in Geheyan Hydropower Plant.
出处
《水电与新能源》
2011年第6期16-17,22,共3页
Hydropower and New Energy