摘要
介绍了龚嘴、铜街子电站大坝渗流监测自动化系统存在的问题,人工与自动化监测比测及成果评价,分析了问题产生的原因并提出了处理意见。
This paper described the problems in automatic monitoring system of dam seepage at Gongzui and Tongjiezi Hydropower Stations,comparison of manmade and automatic monitoring and assessment of results,analyzed the causes of problems and proposed opinions to settle the problems.
出处
《水电与新能源》
2011年第6期43-45,共3页
Hydropower and New Energy
关键词
渗流监测
自动化
更新改造
seepage monitoring
automation
innovation and reform