2McMullen P R, Frazier G V. A simulated annealing approach to mixed-model sequencing with multiple objectives on a JIT line [J]. IIE Transactions, 2000,32(11) :679-686.
3McMullen P R, Tarasewich P. A beam search heuristic method for mixed-model scheduling with setups [ J ]. International Journal of Production Eeonomics, 2005,96(3) :273-283.
4Mansouri S A. A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines[J]. European Journal of Operational Research, 2004,167(32) :696-716.
5Tavakkoli R, Rahimi A R. Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system[J]. Applied Mathematics and Computation, 2006,12(22) :204 - 210.
6Church L, Uzsoy R. Analysis of periodic and event-driven rescheduling policies in dynamic shop[J]. International Journal of Computer Integrated Manufacturing, 1992,5 (3) : 153 - 163.
7Stutzle T, Hoos H. MAX-MIN ant system[J]. Future Generation Computer System, 2000,16(8) :889-914.