摘要
刚果英布鲁水电站为河床式水电站,安装4台单机容量为30 MW的轴流转桨式水轮机组,总装机容量为120 MW。河床电站坐落于弱钙质胶结的白垩系软弱砂岩岩体上,当地物资匮乏,施工条件差,通过合理布置及对结构体型的优化,电站得以顺利建成,为今后在同类地区修建类似工程积累了成功经验。
Imboulou Hydropower Station is a run-of-the-river station,in which four axial-flow Kaplan turbine units of 30MW each are installedwith total installed capacity of 120MW.The station is situated on poor Cretaceous sandstone of weak calcareous cement feature.Since it isshortage of local goods and materials,and the construction condition is poor,the station is constructed by reasonable layout and structuraloptimization,and it gains successful experience for similar projects construction in the same kind of area.
出处
《水利水电工程设计》
2011年第4期23-26,60,共4页
Design of Water Resources & Hydroelectric Engineering
关键词
水电站厂房
厂房布置
设计优化
稳定控制
结构措施
powerhouse,layout of powerhouse,design optimization,stability control,structural measure.