摘要 介绍了华东电网CPS考核指标的基本情况及计算方法。指出风电波动对CPS的影响,风电属于间歇式能源,其出力随着风力的变化而变化,针对风电功率波动这一影响因素,对ACE计算公式进行了修正。举例说明2020年江苏全省风电装机容量将达到1 GW,消纳大量风电带来利益的同时,需要承担相关责任的矛盾也将更加明显,应提前做好合理安排,给出了相应的建议。 This paper firstly introduces CPS Evaluation Indexes and calculation method for East China Power Grid. Then the impact of wind power fluctuations on CPS is pointed out. As a kind of intermittent energy, wind power varies in output subject to the changing force of wind. Therefore considering the wind power output deviation, the ACE calculation formula is amended. Jiangsu Power Grid is illustrated as a case study. By 2020, when the installed wind power capacity in Jiangsu province reaches 10 million kW, enormous wind power consumplion will have brought great benefits, but meanwhile the contradictions of assuming greater responsibilities will be more apparent, we should make reasonable arrangement in advance. Finally some corresponding suggestions are proposed.
出处 《华东电力》 北大核心 2011年第11期1807-1810,共4页 East China Electric Power
关键词 华东电网 CPS ACE 频率考核指标 风力发电 East China Power Grid CPS ACE frequency evaluation index wind power
  • 相关文献

参考文献8

  • 1GJENGEDAL T. System control of large scale wind power by use of automatic generation control(AGC) [ EB/OL ]. IEEE Nov. 25, 2009 Xplor.
  • 2周毅.华东电网CPS考核标准运行分析[J].华东电力,2006,34(5):41-43. 被引量:5
  • 3刘娆,林伟,李卫东,刘乐,王玮,徐兴伟,柳焯.互联电力系统运行控制性能评价标准的探讨[J].电力系统自动化,2005,29(8):87-91. 被引量:18
  • 4HANSEN A D, SORENSEN P, IOV F, et al. Centralised power control of wind farm with doubly fed induction generat- ors[J]. Renewable Energy, 31(2006): 935-951.
  • 5PARSONS B, MILLIGAN M, SMITH J C, et al. Grid Im- pacts of Wind Power Variability : Recent Assessments from a Variety of Utilities in the United States[ C]. NREL/CP-500- 39955, July 2006.
  • 6MAO Jun, YAO M, etaL AGC logic based on NERC's New control performance standard and disturbance control [ J ]. IEEE Transaction on Power System, vol. 15, No. 2, May 2000.
  • 7BOUSSEAU P, BELHOMME R, MONNOT E, et al. Cont- ributon of wind farms to ancillary services[ C ]. Cigre 2006, 21, rue d'Artois, F-75008, Paris, C6-103.
  • 8HERBERT G M J, INIYAN S, SREEVALSAN E, et al. A review of wind energy technologies [ J ]. Renewable and Sus- tainable Energy Reviews, 11 (2007), Aug. 25, 2005, ppl 117-1145.

二级参考文献12

  • 1Control Performance Criteria Training Document. Http://www. nerc. com, 1994. 1-19.
  • 2Performance Standards Reference Document. Training Document Subsections. Http://www. nerc. com, 2002. 1-19.
  • 3JALEELI N, VANSLYCK L S, EWART D et al.Understanding Automatic Generation Control. IEEE Trans on Power Systems, 1992, 7(3): 1106-1122.
  • 4JALEEII N, VANSLYCK L S. NERC' s New Control Performance Standards. IEEE Trans on Power Systems, 1999,14(3): 1092-1099.
  • 5YAO Mao-jun, SHOULTS R R, KELM R. AGC Logic Based on NERC's New Control Performance Standard and Disturbance Control Standard. IEEE Trans on Power Systems, 2000, 15(2): 852-857.
  • 6LUCENTI E D. Overview of the North American Interconnected Power System. Ontario Hydro, 1994.
  • 7HOONCHAREON N, ONG C M, KRAMER R A. Feasibility of Decomposing ACE1 to Identify the Impact of Selected Loads on CPS1 and CPS2. IEEE Trans on Power Systems, 2002, 17(3): 752-756.
  • 8HOONCHAREON N, ONG C M, KRAMER R A.Implementation of an ACE1 Decomposition Method. IEEE Trans on Power Systems, 2002, 17(3): 757-761.
  • 9汪德星.华东电网实行CPS标准的探索[J].电力系统自动化,2000,24(8):41-44. 被引量:91
  • 10徐兴伟,林伟.互联电网控制性能标准下自动发电控制策略的选择[J].电网技术,2003,27(10):32-34. 被引量:29

共引文献20

同被引文献35

引证文献3

二级引证文献147

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部