期刊文献+

基于价值工程的电站设备维修方案优化 被引量:1

Study on Power Plant Equipment Maintenance Program Optimization Based on Value Engineering
原文传递
导出
摘要 指出已有的电站设备维修优化理论缺乏对维修方案优化的相关研究,只能达到技术最优或者成本最经济,且没有相关的量化标准和定量论证。提出了基于价值工程的电站设备维修方案优化方法,认为该方法统筹维修技术与经济成本,综合考虑设备的设计、使用和维修等阶段,以维修方案的效用比最高为优化目标。从理论上对维修方案的内容和维修方案优化的过程进行了阐述。针对某1 000 MW汽轮发电机组的实例,,利用层次分析法等进行定量分析后得出最优的维修实施方案。 For the lack of related research on maintenance optimization, existing power plant equipment maintenance optimization theory can only achieve the aim of being optimal in technology or being economic in cost. There is no relevant quantitative criteria and quantitative demonstration. To solve the above problem, power plant equipment maintenance program optimization methods based on value engineering is presented in this paper. This method takes value engineering principles into concern of the maintenance program optimization, cordinates maintenance technique and economy cost, and considers stages of the equipment design, use and maintenance comprehensively. When the maximum effectiveness of the maintenanee program is set as the optimal target, the optimal implementation plan of maintenance is concluded, by using the AHP and other quantitative analysis. In addition, the content of the maintenance program and the optimizing process of maintenance program are described in this paper theoretically. A case analysis of a 1 000 MW turbine-generator unit shows that the method is simple, effective, and easy to be implemented in engineering practice.
出处 《华东电力》 北大核心 2011年第11期1906-1910,共5页 East China Electric Power
基金 国家自然科学基金资助项目(51075145) 新世纪优秀人才支持计划(NCET-08-0769)~~
关键词 电站设备 维修方案 维修优化 价值工程 power plant equipment maintenance program decision optimization value engineering
  • 相关文献

参考文献7

  • 1A. K.S. JARDINE, T. JOSEPH, D. BANJEVIC. Optimizing condition-based maintenance decisions for equipment subject to vibration monitoring[J]. Journal of Quality in Maintenance Engineering, 1999, 5(3): 192-202.
  • 2WANG W. Modeling condition monitoring intervals : A hybrid of simulation and analytical approaches [.J ]. Journal of the Operational Research Society, 2003, 54: 273-282.
  • 3董玉亮,马履翱,顾煜炯.电站设备短期维修风险决策模型研究[J].华北电力大学学报(自然科学版),2007,34(3):45-49. 被引量:7
  • 4侯文瑞,蒋祖华,金玉兰.基于相对劣化度的视情维修决策模型[J].上海交通大学学报,2008,42(7):1090-1094. 被引量:9
  • 5GRALL A, BRENGUER C, DIEULLE L. A condition-based maintenance policy for stochastically deteriorating systems [ J ]. Reliability Engineering and System Safety, 2002 (76) : 167-180.
  • 6CASTANIER B, GRALL A, BERENGUER C. A condition- based maintenance policy with non-periodic inspection for a two-unit series system [ J ]. Reliability Engineering and Sys- tem Safety, 2005(87) : 109-120.
  • 7蔡景,左洪福,王华伟.基于成本的民用航空发动机维修方案优化研究[J].机械科学与技术,2007,26(2):167-171. 被引量:15

二级参考文献27

共引文献28

同被引文献3

  • 1DL/T572-2010,电力变压器运行规程[S].
  • 2何志俭.变压器全寿命周期成本优化的研究[D].保定:华北电力大学,2010.
  • 3DIJl267-2012,油浸式全密封卷铁芯配电变压器使用技术条件[S].

引证文献1

二级引证文献1

相关作者