挣值法在项目进度成本集成控制中的应用 被引量:1

The Application of Schedule-cost Integrated Study Based on the Method of Earned Value
下载PDF
导出
摘要 挣值法是一种对项目进度、成本进行集成控制的方法,能够客观而清晰地反映出项目目前的运行状态,并能预测项目的未来趋势,它能够在一个较早的时间为项目可能出现的成本超支或进度滞后敲响警钟,能够让项目经理有充足的时间采取相应的措施,保证项目在计划的进度和成本内顺利完成。 The method of earned value is a way to control schedule-cost integrated.It is able to reflect the project——s operating status objectively and clearly and predict the project——s future trends.It can sound the alarm in an earlier time for the possible cost overruns and delayed schedule,make the project manager have enough time to take appropriate measures and ensure the project complete successfully in the program of schedule and cost.
出处 《企业活力》 2011年第12期63-66,共4页 Enterprise Vitality
关键词 挣值法 进度与成本 集成控制 method of earned value schedule and cost integrated control
  • 相关文献

参考文献6

  • 1Fleming Q. W.. Cost/Schedule Control System Criteria: the Management Guide to C/SCSC [M]. Chicago: Probus Publishing Company, 1988.
  • 2Wayne F. Abba. Earned Value Management-- Reconciling Government and Commercial Practices: For People Involved In Earned Value--Government, Industry, Academia, or Consulting---These Are Exciting Times[J]. Program Manager, 1997(1) :58-63.
  • 3朱黎明.挣值分析法在项目管理中的应用[C].2009年全国项目管理教育论文集,2009:416-420.
  • 4[美]项目管理协会.挣值管理实践标准[M].张斌,陈沽译.北京:电子工业出版社,2008.
  • 5王虎,陈韦伶.基于挣值的进度费用控制应用[J].世界科技研究与发展,2006,28(1):86-90. 被引量:9
  • 6毛婧颖.挣值法研究现状及展望[J].项目管理技术,2010,8(2):19-23. 被引量:10

二级参考文献14

共引文献18

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部