摘要
介绍了系统整体总包的模式,说明了出水洞水电站综合自动化改造过程,重点介绍了该水电站综合自动化改造的实施及技术特点,实现了出水洞水电站的综合自动化的管理和投运。
This paper describes model of the system whole main contractor,illuminate the integrated automation transformation process of Chushuidong hydropower.The emphasise is the implementation and technology features of integrated automation transformation of this hydropower station,achieve management and put into operation of integrated automation for Chushuidong hydropower station.
出处
《工业控制计算机》
2011年第11期115-116,121,共3页
Industrial Control Computer