摘要
隧道是一项隐蔽性工程,具有很多未确定性。近年来超前地质预报技术越来越受到建设方、施工方的重视,隧道超前地质预报技术在隧道施工中的应用越来越多,这一项技术在施工中逐渐发挥了其独特的优势。
Tunnel is a secluded engineering, which has lots of uncertainty. In recent years,previous forecast of geology technology is more and more laid store by owner and builder. The previous forecast of geological technology is applied more and more in tunnel construction. This technology increasingly exerts its particular dominance in construction.
出处
《城市道桥与防洪》
2011年第11期112-114,153,共3页
Urban Roads Bridges & Flood Control
关键词
动态施工
超前地质预报
地质灾害
dynamic construction, previous forecast of geology, geology disaster