摘要
宝珠寺水电站工程是国家计划经济体制下的最后一个指令性工程,随着水电建设体制改革的进一步发展,宝珠寺水电站工程建设由施工单位总承包转换为业主负责制的建设管理模式。在体制转换后的工程监理工作,具有一般水电站工程监理的共性,也有它的特殊性。
The Baozhusi hydropower station is the last mandatory project under state planned economy system. With the further development of system reformation,the construction and management mode is changed from package deal by construction unit into Owner responsibility system during the construction of the Baozhusi hydropower station.Supervision after system conversion is not only common,but also special.
出处
《四川水力发电》
1999年第B12期31-33,共3页
Sichuan Hydropower
关键词
水电站
体制
转换
工程监理
Baozhusi hydropower station
system
conversion
project
supervision